Two units, same building, three years apart, tell most of this story. A 15th-floor residence at Marina Pointe's first tower sold under a pre-construction contract for $1,580,922. The buyer resold it roughly three years later for $2,450,000. One floor up, a 16th-floor unit purchased for $1,267,436 changed hands in 2025 for $1,800,000. Those numbers come from the developer's own case study, and they are real, recorded sales.
Those resales provide a point of comparison for buyers considering the next tower.
Marina Pointe's first building, inside the Westshore Marina District on Tampa's western waterfront, sold out and finished construction in May 2023. In November 2025, the development opened pre-construction sales on its second tower, Luna, with pricing that starts around $1 million and runs past $4 million for larger residences. Luna's sales materials pair Tower One's resale history with the new tower's pre-construction pricing.
That history doesn't establish what Luna will be worth, and the difference matters if you're comparing new construction options anywhere in Tampa's luxury tier right now.
The Limits of the Comparison
A completed, sold-out building is a fact. A pre-construction tower with a groundbreaking still pending has projected prices and has not yet been built. As of late August 2026, public development trackers still listed Luna as pre-construction, with groundbreaking anticipated sometime later this year and completion targeted for around December 2028. That is a two-year gap between the deposit a buyer writes today and the finished residence that determines what it is actually worth.
The resale numbers from Tower One are real evidence of what happened in a specific building, on a specific timeline, in a market that ran hot for much of that stretch. They are not a warranty on what Luna will do. A completed phase can provide context for the next one, but its sales history is not an appraisal of a building that hasn't gone up yet.
What the Building Doesn't Have Yet
Buyers evaluating Luna, or any pre-construction tower in Tampa right now, are underwriting two different things at once: the finished product and the timeline to get there. Marina Pointe's own materials draw a distinction between the two towers on exactly this point. Tower One's early buyers committed when the marina wasn't yet active and the surrounding district was still emerging. Luna's buyers are entering a peninsula where the 150-slip marina is already operating, the waterfront promenades are open, and the Marina Landings town center is serving residents daily. That is a genuinely different risk profile than the first tower carried, and it's worth taking at face value. It does not, on its own, tell you what a unit purchased today will be worth on delivery in 2028.
Detached Home Builder Pricing
Condo tower pricing may change from phase to phase. Detached luxury-home builders may use a different approach, keeping advertised prices steady while offering incentives.
Nationally, the National Association of Home Builders' August 2026 survey found that 35 percent of builders had cut prices, with those who did cutting by an average of 6 percent. So roughly two-thirds did not cut their list prices. In practice, across Tampa's new-construction listings, the more common move isn't a lower number, it's a rate buydown, a closing cost credit, or a package of included upgrades layered on top of the same sticker price. Incentives can change a buyer's overall terms without changing the advertised price.
That distinction changes how you should read an advertised price on a detached new build. A base price plus a lot premium plus a selections package can move the real number by tens of thousands of dollars before any incentive shows up on a settlement statement. The headline figure and the number you actually finance are rarely the same, and the gap tends to run in the opposite direction of what a falling asking price would suggest.
| Condo Tower Phased Release | Detached Home Builder Pricing | |
|---|---|---|
| How the sticker price behaves | May vary by phase | Holds steady or moves only slightly |
| What actually shifts | The advertised price | Incentives, upgrades, and financing terms |
| What to compare | Sales in earlier phases | Incentives and final purchase terms |
| What to verify | Whether the prior phase's resales are typical, not best-case | The all-in price after lot premium and selected options |
Three More South Tampa Townhome Projects
South Tampa also has luxury townhome projects in development, including projects by developers Daniel and Samuel Ochstein. Palm Park, a gated community of 13 steel-framed townhomes at 6526 S. MacDill Ave., had sales originally planned for August 2026 with pricing expected between $1.2 million and $1.6 million, and completion targeted between November 2026 and January 2027. In Beach Park, demolition of the former commercial building at 200 S. Hoover Blvd. wrapped in May 2026 to clear the site for Arete, an 80-unit townhome community. As of late August 2026, groundbreaking was expected within a couple of months, with pricing anticipated to range from $900,000 to $2.5 million once floor plans are finalized. A third project from the same team, Almare, follows the same steel-framed approach.
A small development with a handful of units differs in scale from a 151-unit tower. In either type of project, prices and sales in earlier releases can offer context for later releases, but do not by themselves establish future resale values.
What This Means If You're Comparing New Construction Right Now
None of this means phased pricing is a reason to avoid new construction in Tampa's luxury segment. Genuine scarcity is real in Bayshore, South Tampa, and the Westshore waterfront, where buildable waterfront land is close to gone and most new luxury product now comes from teardown-and-rebuild rather than open land. Scarcity and phased pricing are separate considerations, and neither by itself establishes a future sale price.
Before treating a "prices are rising with each phase" pitch as proof of future value, it's worth asking a developer or listing agent for specifics rather than the headline case study:
- What percentage of the current phase has actually sold, and at what price tiers, not just the top-line asking price
- How the per-square-foot price compares to completed, occupied units nearby rather than to other pre-construction listings
- What the builder's or developer's track record looks like for hitting its own completion timeline on prior phases
- Whether the "early buyer" resale story being used to sell you is representative of most units in that phase, or a single standout floor
A completed building with a marina running and shops open, like Marina Pointe's first tower, gives you something to actually inspect. A tower still listed as pre-construction gives you a rendering and a timeline. Both can be reasonable purchases. They are not the same purchase, and the price on the page won't tell you which one you're looking at.
If you're weighing a pre-construction listing against a finished waterfront estate, a resale condo, or one of South Tampa's new custom builds, the Margliano Team can walk through the actual sales history behind any development you're considering, not just the case study in the brochure. Schedule a private market consultation before you sign a reservation agreement on a building that hasn't broken ground yet.